Customization: | Available |
---|---|
Task: | Program |
Structure: | Combination |
Still deciding? Get samples of US$ 10000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
7.4.1 |
Setting & Configuration , Maintenance, Recorded Data Analysis through Setting & Analysis Tool |
Modbus, Baud Rate:38400 bps Connector Type: USB-A/RS-232C |
USB (On FRTU Front Panel), Setting and Configuration Change (Bath Job) Protocol Monitor (Communication Frame Check) Real time Display: Measurement and Status Data Event List and Fault Oscillograph Demand Load Profiling & Graphical Display FRTU Firmware Download |
7.4.2 |
SCADA |
DNP3.0 |
1.RJ45 Ethernet Port, 2.TCP/IP:10/100 BASE-T |
7.4.3 |
IEC60870-5-101/104 |
||
7.4.4 |
IEC61850(optional) |
||
7.4.5 |
IEC60870-5-101 |
1.RS-232C PORT(ON FRTU Left sideIinside the inner door) 2.SCAA OR DAS Communication Interface Through Cable /Wiress/Fiber Optic Modems. 3.Remote Operation (Control, Status Monitoring, Tele-metering), 4.Remote Setting (optional), Time Synchronization between FRTU and Control Center System, 5.File Transfer (Event & Fault Data; DNP protocol only) |