12kv/15kv/27kv/38kv/72.5kv 50Hz/60Hz Vertical Installation Vertical Opening Pole Mounted Disconnector with Motroised Driven with Ground Blade

Product Details
Customization: Available
Type: High-voltage
Structure: Double-column Disconnector
Still deciding? Get samples of US$ 1/Piece
Request Sample
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500 RMB
Plant Area
1001~2000 square meters
  • 12kv/15kv/27kv/38kv/72.5kv 50Hz/60Hz Vertical Installation Vertical Opening Pole Mounted Disconnector with Motroised Driven with Ground Blade
  • 12kv/15kv/27kv/38kv/72.5kv 50Hz/60Hz Vertical Installation Vertical Opening Pole Mounted Disconnector with Motroised Driven with Ground Blade
  • 12kv/15kv/27kv/38kv/72.5kv 50Hz/60Hz Vertical Installation Vertical Opening Pole Mounted Disconnector with Motroised Driven with Ground Blade
  • 12kv/15kv/27kv/38kv/72.5kv 50Hz/60Hz Vertical Installation Vertical Opening Pole Mounted Disconnector with Motroised Driven with Ground Blade
Find Similar Products

Basic Info.

Model NO.
GW1
Operation
Electric
Grounding Mode
Grounding
Movement Mode
Vertical Rotary Type
Number of Poles
Three Pole
Grounding
Single Ground
Certification
ISO
Transport Package
Carton with Wooden
Specification
15KV/27KV/38KV, 50HZ/60HZ,
Trademark
HEMG
Origin
China
Production Capacity
10000

Product Description

12kv/15kv/27kv/38kv/72.5kv 50Hz/60Hz Vertical Installation Vertical Opening Pole Mounted Disconnector with Motroised Driven with Ground Blade

1  General
    GW1-35 Outdoor high voltage separation relationship outdoor installation general purpose isolating switch. Forthree-phase alternating current 50Hz. Rated voltage 12KV AND 35KV and below the power system. The circuit is switched on when there is a voltage without a negative voltage.. The product is in line with the GB1985 "AC high voltage isolation switch and grounding switch". DL486 order "technical conditions for AC high voltage isolating switch,The national standard DL/T593 "high voltage isolation switch equipment common order technical conditions" and the power industry standard.   
2  Using environmental conditions.
2.1 altitude 4000M.
2.2 ambient temperature is -25 degrees C to +40.
2.3 wind pressure is not more than 700Pa.
2.4 ice thickness is not more than 1mm.
2.5 earthquake intensity is not more than 8 degrees.
2.6 the installation site should have no regular violent vibration and flammable. Effect of explosive material and chemical corrosion.
4  Model specifications and technical parameters
Serial number     Project Model specification
630A 630
A
D
3150A 3150A
D
4000A 4000A
D
1 Rated voltage(kV) 35 35 35 35 35 35
2 Maximum operating voltage(kV) 40.5 40.5 40.5 40.5 40.5 40.5
3 Rated current(A) 630 630 3150 3150 4000 4000
4 4S short-time withstand current(kA) 25 25 31.5 31.5 31.5 31.5
5 Rated peak withstand current(kA) 63 63 80 80 80 80
6 1minEffective value of power frequency withstand voltage On the ground 42 42 42 42 42 42
Fracture 48 48 48 48 48 48
 
5 Structure principle
5.1GW1 - 35 switch outline and installation dimensions are shown in Figure 2.
GW1 - 35 for single phase structure. Each phase consists of a chassis, the main knife (ground knife), movable contact head, static contact head, shaft, rod insulators. Three-phase through a connecting pipe is connected, the operation shaft with rod insulators to drive the main knife switch, touch knife with trough outline form, increased mechanical strength and heat dissipation area.
5.2  GW1-35D -switch is a kind of switch on the GW1 - 35 to add a ground knife.
Equipped with CS6-2 operating mechanism after the, can achieve the main knife switch, knife cannot contract; knife switch, the surgeon can not closing the anti error interlocking requirements.
5.3  GW1 - 35 switch with CS6-2 mechanism (see Figure 1).
6 Installation and adjustment
6.1  GW1 - 35 in the installation site for three - phase connection and the operation of the motivation structure. Installation diagram see Figure 3. The 2 switch based 10 channel as channel and switch bottom mounting frame.
Vertical arrangement of frame. To adjust in the following order.
6.2 The switch is arranged on the foundation (the main contact cutter and the grounding knife in the closing state) adjust three-phase coaxial switch. 3/4 water gas pipe three switch welding connection.Then Switch fixed.
6.3  The handle of the mechanism is arranged in the same position with the switch of the switch. The crank arm is welded to the water gas pipe. Attention should be paid to the welding angle and length of the crank arm. GW1 - 35 switch principal axis welding long crank arm L = 120,W1 - 35 switch,The main knife shaft welding arm L = 120mm, grounding knife shaft welding arm L = 120mm. according to the size of welding rod installation.
6.4 Connecting the switch and the actuating mechanism with the connecting rod. Three-phase synchronization inching switch, the three phase is less than or equal to 3mm.
6.5 Switch installation adjustment is completed. Operation 20 times to check parts is loose, three-phase synchronization changes, the earthing switch is closing in place, operating mechanism can reach the designated position and lock.
6.6 After installation and adjustment, according to the following acceptance of the project.
 
Serial numbe   Acceptance content     technical requirement
1 Appearance Testing Rust proof. The switch name brand is correct, the position is correct. The fastening part of the fastener without loosening, and ensure the verticality and shaft coaxial switch.
2 Spring pressure 630A 431±39N
 1250A  3150A 441±44
3 The main knife fracture distance 360mm
4 Ground knife fracture distance (on the ground) 360mm
5 The main switch three phase 5mm
6 Operating torque The main knife 300N·M
The grounding knife 300N·M
7 The surgeon and the knife body chain Don't switch on the main knife knife switch, knife knife not closing closing.
8 Switching operations The operation is flexible, convenient and accurate. Check pin down hole correctly. The main and the ground knife can be divided into place.
 7 Operation and maintenance
 7.1 Before putting into operation, the contact parts of the conductor should be in good contact with each other. Switch and bus connection should be reliable. The moving parts should be flexible.
 7. 2 Operation: the switch must be cut off before the line can be operated.
 7.3 Switch shall be carried out for 12 times a year, and the following items should be paid attention to during the overhaul:
 7.3.1 Check the stability of the structure and the connection is reliable.
 7.3.2 Maintenance of conductor contact surface is in contact with the surface coated with neutral vaseline.
 7.3.3 Replace damaged parts.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier