69kv/23kv-2.3kv Mobile Substation

Product Details
Customization: Available
Application: Power
Phase: Three
Still deciding? Get samples of US$ 500000/Piece
Request Sample
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500 RMB
Plant Area
1001~2000 square meters
Find Similar Products

Basic Info.

Model NO.
MS1000
Certification
ISO9001-2000
Usage
Power Transformer
Frequency Characteristics
High Frequency
Production Capacity
100

Product Description

69kv/23kv-2.3kv Mobile Substation
69kv/23kv-2.3kv Mobile Substation


 

Item 1: SUBESTACIÓN MÓVIL  69/13.8 kV 16/20. MVA.

 COMPUESTA DE:

A.       TRANSFORMAFOR DE POTENCIA

 

Item

Descripción

Parámetro Solicitado

Parámetro Ofertado

 

1

MARCA

Especificar

HEMG 

 

1.1

CANTIDAD

1

1 

 

2

PROCEDENCIA

Especificar

 CHINA

 

3

NORMAS APLICADAS

ANSI o IEC

IEC 

 

4.

CARACTERISTICAS DEL TRANSFORMADOR

 

 

 

 4.1

TIPO CONSTRUCTIVO, BUSHINGS DE MT, COSTADO TAPA

 

Tanque con conservador y membrana,  

YES 

 

 4.2

NUMERO DE FASES

3

 3

 

 4.3

FRECUENCIA DEL SISTEMA

60 Hz

60HZ 

 

 4.4

VOLTAJE LADO DE ALTA TENSIÓN

69 kV

69KV 

 

 4.5

VOLTAJE LADO DE BAJA TENSIÓN

13.8 kV

13.8KV 

 

4.6

TENSION MAXIMA BOBINADOS

72.5/15.5 kV

72.5KV/15.5KV 

 

4.7

MINIMA DISTANCIA DE CONTORNEO BUSHING AT

≥ 1813 mm

1813 

 

4.8

MINIMA DISTANCIA DE CONTORNEO BUSHING BT

≥ 400 mm

     400

 

 4.9

DESPLAZAMIENTO ANGULAR DEL LADO DE BAJA TENSION RESPECTO AL DE ALTA TENSION

Dyn 1

DYN11 

 

4.10

ALTURA DE MONTAJE

hasta 1000 msnm

1000MSNM 

 

4.11

DESPLAZAMIENTO ANGULAR

30 grados

30DEGREE 

 

4.12

SISTEMA DE ENFRIAMIENTO

ONAN/ONAF

ONAN/ONAF 

 

4.13

NEUTRO

Exterior

OUTDOOR 

 

 4.14

 AISLAMIENTO

Inhibido en aceite mineral dieléctrico tipo II

INHIBITED IN MINERAL OIL,DIELECTRIC TYPE II 

 

4.15

Temperatura de los devanados

≤ 55 C

≤ 55 C

 

4.16

Temperatura punto más caliente

≤ 65 C

≤ 65 C

 

4.17

Temperatura del aceite (punto superior)

≤60 C

≤60 C

 

4.18

POTENCIA NOMINAL ONAN /ONAF

16/20 MVA

16/20 MVA

 

5

PERDIDAS CON EL 100% DEL VOLTAJE DE EXCITACIÓN NOMINAL

 

 

 

5.1

a) PERDIDAS EN EL HIERRO SIN CARGA

≤ 14 kW

≤ 14 kW

 

5.2

b) PERDIDAS EN EL COBRE A 100% DE LA POTENCIA NOMINAL ONAN

≤ 70 kW

≤ 70 kW

 

5.3

c) PÉRDIDAS TOTALES Po + Pcu A 100% DE LA CAPACIDAD ONAN Y ONAF

Especificar

90KW 

 

6

CONSUMO EN EQUIPOS AUXILIARES

 

 

 

6.1

A 100% DE CAPACIDAD ONAN

Especificar

0 

 

6.2

A 100% DE CAPACIDAD ONAF

Especificar

1.5KW 

 

7

Nivel de ruido a 100% capacidad ONAN/ONAF

Especificar

 65DB

 

8

IMPEDANCIA NOMINAL A 75°C

7-8 %

7-8% 

 

9

REGULACION A LA CAPACIDAD ONAN  EN PORCENTAJE

 

 

 

9.1

100% DE FACTOR DE POTENCIA

% Especificar

99.55% 

 

9.2

80% DE FACTOR DE POTENCIA

% Especificar

99.44% 

 

10

CORRIENTE DE EXCITACIÓN EN PORCENTAJE DE LA CORRIENTE A CAPACIDAD OA:

 

 

 

10.1

100% DEL VOLTAJE DE EXCITACIÓN

% Especificar

0.2% 

 

10.2

110% DEL VOLTAJE DE EXCITACIÓN

% Especificar

0.8% 

 

11

ELEVACION DE TEMPERATURA POR EL METODO DE RESISTENCIA EN REGIMEN CONTINUO

 

 

 

11.1

DEVANADOS (PROMEDIO)

≤ 55 °C

≤ 55 °C

 

11.2

DEVANADOS (PUNTO MAS CALIENTE)

≤ 65°C

≤ 65°C

 

11.3

ACEITE (PUNTO SUPERIOR)

≤ 60 °C

≤ 60 °C

 

12

NIVEL BASICO DE AISLAMIENTO (BIL)

 

 

 

12.1

* IMPULSO 1.2/50 us

 

 

 

12.1.1

BOBINADOS (PRIMARIO/SECUNDARIOS)

≥ 350/95 kV pico

≥ 350/95 kV pico

 

12.1.2

BUSHINGS (PRIMARIO/SECUNDARIO)

≥ 350/125 kV pico

≥ 350/125 kV pico

 

12.1.3

BUSHING NEUTRO (SECUNDARIO)

≥ 125 kV pico

≥ 125 kV pico

 

12.2

* 60 Hz

 

 

 

12.2.1

BOBINADO (PRIMARIO/SECUNDARIO)

≥ 140/50 kV rms

≥ 140/50 kV rms

 

12.2.2

BUSHING (PRIMARIO/SECUNDARIO)

≥ 175/50 kVrms

≥ 175/50 kVrms

 

12.2.3

BUSHING NEUTRO /SECUNDARIO

≥ 40 kV rms

≥ 40 kV rms

 

13

CLASE DE AISLAMIENTO DE LOS DEVANADOS DE ALTA TENSION

 

 

 

13.1

LADO DE ALTA TENSION

69 kV

69 kV

 

13.2

ONDA DE CHOQUE (CHOPPED WAVE LEVEL)

≥ 385 kV cresta

≥ 385 kV cresta

 

13.3

LADO DE BAJA TENSION Y NEUTRO

15 kV

15 kV

 

13.4

ONDA DE CHOQUE (CHOPPED WAVE LEVEL)

≥ 105 kV cresta

≥ 105 kV cresta

 

14

CLASE DE AISLAMIENTO DE LOS BUSHINGS

 

 

 

14.1

LADO DE ALTA TENSION

69 kV

69 kV

 

14.2

PRUEBA DE BAJA FRECUENCIA, SECO 1 MINUTO

60 kV rms

60 kV rms

 

14.3

PRUEBA DE BAJA FRECUENCIA, HUMEDO 10 SEGUNDOS

140 kV rms

140 kV rms

 

14.4

ONDA COMPLETA, PRUEBA DE IMPULSO

350 kV cresta

350 kV cresta

 

15

CLASE DE AISLAMIENTO DE LOS BUSHINGS LADO BAJA TENSIÓN

 

 

 

 15.1

LADO DE BAJA TENSION (13.8kV) SEAN PARA UN VOLTAJE DE (VER ANEXO 1)

kV

kV

 

15.2

PRUEBA DE BAJA FRECUENCIA, SECO 1 MINUTO

50 kV rms

50 kV rms

 

 15.3

PRUEBA DE BAJA FRECUENCIA, HUMEDO 10 SEGUNDOS

45 kV rms

45 kV rms

 

 15.4

ONDA COMPLETA, PRUEBA DE IMPULSO

150 kV cresta

150 kV cresta

 

16

CONMUTADOR PARA CAMBIO DE TAPS EN ALTA TENSION (69 kV)

 

 

 

 16.1

REGULACION SOBRE EL VOLTAJE NOMINAL (NUMERO DE PASOS Y PORCENTAJES POR PASO)

+-2 x 2.5% manual sin tension

+-2 x 2.5% manual sin tension 

 

17

PRUEBA DE VOLTAJE APLICADO

 

 

 

 17.1

ALTA TENSION

kV Especificar

140KV 

 

 17.2

BAJA TENSION (acorde a la norma ansi c57.12)

kV Especificar

50KV 

 

 17.3

CIRCUITOS AUXILIARES

1.5 kV

1.5KV 

 

18

PRUEBA DE VOLTAJE INDUCIDO

 

 

 

 18.1

 LADO DE ALTA TENSION

kV Especificar

150KV 

 

 18.2

LADO DE BAJA TENSION (acorde a la norma ansi c57.12)

kV Especificar

 50KV

 

19

EQUIPO DE ENFRIAMIENTO

Especificar

AIR/FAN 

 

20

TIPO DE ACEITE

Mineral

MINERAL 

 

 20.1

CONTENIDO DE PCB´s

sin PCBs

WITHOUT PCB 

 

20.2

CERTIFICADOS DEL ACEITE

Especificar

 YES

 

21

TRANSFORMADORES DE CORRIENTE TIPO BUSHING

 

 

 

21.1

MARCA

Especificar

NJ

 

21.2

PROCEDENCIA

Especificar

 CHINA

 

 21.3

NUMERO DE TRANSFORMADORES DE CORRIENTE EN LOS BUSHINGS DE ALTA TENSION PARA PROTECCION

3

3

 

21.4

 NUMERO DE TRANSFORMADORES DE CORRIENTE EN LOS BUSHINGS DE BAJA TENSION ( 3 DE PROTECCION Y 3 DE MEDICION)

6

6

 

21.5

NUMERO DE TRANSFORMADORES DE CORRIENTE EN LOS BUSHINGS DEL NEUTRO

1

1

 

21.6

NUMERO DE TRANSFORMADORES DE CORRIENTE PARA IMAGEN TERMICA

1

1

 

21.7

CLASE DE PRECISIÓN PARA MEDICIÓN

CL 0.2 O EQUIVALENTE

CL 0.2 O EQUIVALENTE

 

21.8

CLASE DE PRECISIÓN PARA PROTECCIÓN

5P 20

5P 20

 

21.9

CAPACIDAD CONTINUA(PROTECCIÓN/MEDICIÓN)

50/25 VA

50/25 VA

 

22

DIMENSIONES APROXIMADAS DEL TRANSFORMADOR

 

 

 

22.1

ALTURA TOTAL

(m) Especificar

4.0M

 

22.2

ANCHO TOTAL

(m) Especificar

3.1M

 

22.3

LARGO TOTAL

(m) Especificar

5.0M

 

22.4

ALTURA DEL TANQUE

(m) Especificar

0.5M

 

22.5

ALTURA HASTA LOS TERMINALES DE LOS BUSHINGS DE ALTA TENSIÓN

(m) Especificar

4.2M

 

22.6

DIMENSIONES DE LAS PIEZAS MÁS GRANDES DEL TRANSPORTE (ALTO-LARGO-ANCHO)

(m) Especificar

4,0MX5.0MX3.1M

 

23

PESOS APROXIMADOS NETOS

 

 

 

 23.1

NUCLEO Y BOBINAS

Especificar

17.2TON 

 

 23.2

TANQUE Y ACCESORIOS

Especificar

10.4TON 

 

 23.3

ACEITE

Especificar

8.5TON 

 

 23.4

PESO TOTAL

Especificar

36.2TON 

 

 23.5

PESO BRUTO DE LA PARTE MÁS PESADA DEL TRANSPORTE

Especificar

31TON 

 

24

VARIOS

 

 

 

 24.1

MATERIAL DE LOS DEVANADOS

Cobre

COPER 

 

 24.2

MATERIAL DEL NUCLEO

Acero de granos orientados

 YES

 

 24.3

MATERIAL DEL TANQUE

Especificar

Q235B 

 

 24.4

CORRIENTE DE CORTOCIRCUITO QUE PUEDE SOPORTAR

Especificar

1.29KA/11.1KA 

 

 24.5

PINTURA EXTERNA

Especificar

polyurethane  PAINTING

 

 24.6

PINTURA INTERNA

Especificar

polyurethane  PAINTING 

 

 24.7

PRESIONES QUE PUEDE SOPORTAR TANQUE Y RADIADORES

Especificar

133PA 

 

 24.8

SISTEMA DE ENFRIAMIENTO AUTOMATICO: RADIADORES (Panel Oblea Desmontable), VENTILADORES ( integrados a los radiadores)

Especificar

PC  RADIATOR

DBF FAN 

 

 24.9

MECANISMOS DE ALARMA Y SUPERVISIÓN SISTEMA DE ENFRIAMIENTO

Incluido

INCLUDED 

 

 24.10

VALVULAS, PARA LA CUBA, Tapa del Tanque; para toma de muestras, para prensa filtro, drenar, retención radiadores, de interconexión de radiadores

Incluido

 INCLUDED

 

 24.11

TIPO DE CONMUTADOR

Especificar

OFF LOAD TAP CHANGER 

 

 24.12

MARCA DE CONMUTADOR

Especificar

 DT

 

 24.13

TIPO DE BUSHINGS PRIMARIOS (EN POLIMERO).

Especificar

 CAPACITOR TYPE IN POLYMER

 

 24.14

TIPO DE BUSHINGS SECUNDARIOS (AL COSTADO DE LA TAPA)

Especificar

 PORCELAIN

 

 24.15

TERMOMETRO DE ACEITE

Incluido

INCLUDED 

 

 24.16

TERMOMETRO DE DEVANADOS

Incluido

INCLUDED  

 

 24.17

VALVULA DE ALIVIO DE SOBREPRESION,Y BUCHHOLTZ

Incluido

INCLUDED  

 

 24.18

MANOMETRO

Incluido

INCLUDED  

 

24.19

INDICADOR DE NIVEL DE ACEITE CON CONTACTOS DE NIVEL PARA Y DISPARO

Incluido

INCLUDED  

 

24.20

INDICADOR DE TEMPERATURA DEL ACEITE CON CONTACTOS DE ALARMA Y DISPARO

Incluido

INCLUDED  

 

24.21

RELÉ DE PRESIÓN SUBITA CON CONTACTOS

Incluido

INCLUDED  

 

24.22

VALVULA PARA TOMA DE MUESTRAS, LLENADO, VACIADO Y FILTRADO DE ACEITE

Incluido

INCLUDED  

 

 24.23

PARARRAYOS (3 para AT) 60kV 48kV MCOV

0

0

 

 24.24

PARARRAYOS (3 para MT) 10kV 8.4kV MCOV

3

3

 

 24.25

CONTADORES DE DESCARGA  PARA  BT

Incluido uno por cada pararrayo

YES 

 

 24.26

BASES PARA PARARRAYOS

Incluido para el lado de MT

YES 

 

 24.27

GABINETE DE CONTROL (MANDO Y PROTECCIÓN DE VENTILADORES Y CAJA DE BORNES)

Incluido

INCLUDED  

 

 24.28

CAJA Y BLOQUES TERMINALES

Incluido

INCLUDED  

 

 24.29

VENTILADORES PARA REFRIGERACIÓN FORZADA (240/120V)

Incluido

INCLUDED  

 

 24.30

TAPA  PARA SOPORTAR VACIO PLENO

Incluido

INCLUDED  

 

 24.31

PERNOS DE ANCLAJE ANTISISMICO PARA MONTAJE SOBRE PLATAFORMA.

 

Incluido

INCLUDED  

 

 24.32

VALVULAS DE CIRCULACION DE ACEITE (FILTRADO)

Incluido

INCLUDED  

 

 24.33

ACCESORIOS PARA MANIOBRA Y FACILIDADES PARA IZAR

Incluido

INCLUDED  

 

24.34 

CUATRO CONECTORES DE PUESTA A TIERRA COLOCADAS EN EL TANQUE DEL TRANSFORMADOR

Incluido

INCLUDED  

 

 24.35

PLACA DE CARACTERÍSTICAS SEGÚN NORMA ANSI o IEC

Incluido

INCLUDED  

 

 24.36

REFUERZO EN LA BASE DEL TRAFO PARA LA COLOCACIÓN DE GATOS DE IZAJE

Especificar

YES,OBLIGATE 

 

 24.37

ACEITE, certificados de contenido de PCBs de Institutos acreditados en el país o internacionales

Incluido

INCLUDED  

 

25

SISTEMA DE MONITOREO

 

 

 

25.1

EQUIPOS DIGITALES DE DETECCIÓN DE: - GASES (minimo Hidrogeno (H2), Metano (CH4), Etano (C2H6), Etileno (C2H4), Acetileno (C2H2), Monóxido de Carbono (CO), Dióxido de Carbono (CO2)), - HUMEDAD, - TEMPERATURA DE ACEITE Y DEVANADO, - PROTOCOLO DE COMUNICACIÓN DNP3, IEC61850, PUERTO ETHERNET PARA CONFIGURACIÓN REMOTA, - SOFTWARE DE CONFIGURACIÓN PROPIETARIO DEL EQUIPO, - LICENCIA DE FUNCIONAMIENTO Y ACTUALIZACIÓN ILIMITADA, - PUERTO RS-485, - PUERTO IRIGB. EL MONITOR DEBERA SENSAR LA TEMPERATURA DEL BOBINADO DIRECTAMENTE UTILIZANDO SONDAS DE FIBRA OPTICA.

Incluido

INCLUDED  

 

25.2

CONTROLADOR Y CONCENTRADOR DE SEÑALES CON:

Incluido

INCLUDED  

 

- PROTOCOLO DE COMNICACIÓN DNP3, IEC61850

- PUERTO DE ETHERNET PARA CONFIGURACIÓN REMOTA

- SOFTWARE DE CONFIGURACIÓN PROPIETARIO DEL EQUIPO             -LICENCIA DE FUNCIONAMIENTO Y ACTUALIZACIÓN ILIMITADA

- PUERTO RS-485

-PUERTO IRIGB

25.3

 CAPACITACIÓN CERTIFICADA POR EL FABRICANTE DE LOS EQUIPOS, TEÓRICA Y PRÁCTICA A PERSONAL TÉCNICO DE CNEL EP UN GLR, POR UN  TIEMPO MAYOR O IGUAL A 20 HORAS.

Incluido

 INCLUDED 

 

26

PRUEBAS A REALIZARSE EN CAMPO

 

 

 

 26.1

INSPECCIÓN VISUAL COMPLETA, CABLEADO, ACABADO, ETC.

Incluido

INCLUDED  

 

 26.2

MEDIDA DE RELACIÓN DE TRANSFORMACIÓN

Incluido

INCLUDED  

 

 26.3

VERIFICACION DE POLARIDAD Y CONTROL DE GRUPO DE CONEXIÓN

Incluido

 INCLUDED 

 

26.4

MEDICIÓN DE RESISTENCIA DE DEVANADOS

Incluido

INCLUDED  

 

26.5

MEDICIÓN DE LA CAPACITANCIA Y TANGENTE DELTA DEL AISLAMIENTO DE LAS BOBINAS

Incluido

INCLUDED  

 

26.6

PRUEBA FISICO-QUIMICAS DEL ACEITE DIELÉCTRICO

Incluido

INCLUDED  

 

26.7

PRUEBAS FUNCIONALES DE OPERACIÓN DE LOS ACCESORIOS DEL TRANSFORMADOR

Incluido

INCLUDED  

 

26.8

PRUEBA FRA (Frequency response Analysis)

Incluido

INCLUDED  

 

26.9

CAJA REGISTRADOR DE IMPACTOS

Incluido

INCLUDED  

 

26.10

DATABOOK (CATALOGO) EN EL CUAL  SE MUESTRE DETALLES DE LA FABRICACIÓN DEL  TRANSFORMADOR: INSTRUCCIONES, ACCESORIOS,PROTOCOLO DE PRUEBAS Y PLANOS (IDIOMA INGLES O ESPAÑOL)

ENTREGAR  2 COPIAS DE LOS DATABOOKS DE CADA TRANSFORMADOR UNA VEZ, TERMINADOS DE FABRICAR( en formato físico y digital)

 YES

 

27

REPUESTOS PARA CADA  TRANSFORMADOR (especificar marcas).

 

 

 

27.1

UN BUSHING DE ALTA TENSION

Incluido

INCLUDED  

 

27.2

UN BUSHING DE BAJA TENSION

Incluido

INCLUDED  

 

27.3

UN JUEGO COMPLETO DE EMPAQUES (MANHOLES Y HANDHOLES)

Incluido

INCLUDED  

 

27.4

UN DISPOSITIVO DE ALIVIO DE PRESION

Incluido

INCLUDED  

 

27.5

UN TERMOMETRO DE TEMPERATURA DE ACEITE

Incluido

INCLUDED  

 

27.6

UN TERMOMETRO DE TEMPERATURA DE DEVANADOS

Incluido

INCLUDED  

 

27.7

UN JUEGO DE CONTACTORES QUE ACCIONAN LOS VENTILADORES

Incluido

INCLUDED  

 

27.8

10 % DE MINIBREAKERS

Incluido

INCLUDED  

 

27.9

10% DE LA CANTIDAD DE ACEITE REQUERIDA EN EL TRANSFORMADOR

Incluido

INCLUDED  

 

27.10

UN JUEGO DE CONECTORES UNIVERSALES PARA BUSHINGS DE ALTA TENSION

Incluido

 INCLUDED 

 

27.11

UN JUEGO DE CONECTORES UNIVERSALES PARA BUSHINGS DE MEDIA TENSION Y NEUTRO

Incluido

INCLUDED  

 

27.12

UN PARARRAYO PARA ALTA TENSION

NO

 NO

 

27.13

TRES PARARRAYO PARA MEDIA TENSION

Incluido

INCLUDED  

 

28

Supervisión de montaje: Por motivo de la garantía técnica del equipo, se debe considerar dentro del valor ofertado:  el costo de supervisión de montaje del técnico de fabrica para el periodo del armado, actividad que será realizada por el suministrador, y los costos de las pruebas en sitio estipuladas en el Item 26. Se considerará la entrega a satisfacción de CNEL EP UN GLR una vez puestos en operación en el sitio definitivo, periodo que deberá cumplirse hasta en 60 días luego de los 190 días estipulados para la entrega de los equipos en la subestaciòn destinada por CNEL EP UN GLR.

 

INCLUDED

 

 

 

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier